Township Garage Progress

Township Garage Progress

September 8, 2018 Garage Roads 0

The Township Garage is coming along. The sub-floor plumbing and radiant heat system insulation and piping is in and the floor has been poured. With a solid foundation the exterior shell can begin going up. Here are some photos showing the progress.

Footers poured and rough plumbing in.

Interior floor area graded.

Insulation and piping for radiant heat system laid out.

Half of floor poured and the other half prepped with reinforcement and radiant heat piping secured.

We would like to thank the Township employees and Trustee Mike Cliff for their hard-work installing the radiant heat system insulation and piping.  We would also like to thank the builder, John Boczar, for his patience and assistance in accommodating the Township with this part of the building process.